Total Performance Oriented Retrofits (TPOR)

TPOR is the process of optimizing existing control systems with custom algorithms based on actual building load conditions. Additionally, we implement energy efficient retrofit technologies for a state of the art facility. All of this is performed within your existing RIO criteria.

TPOR processes provide detailed recommendations to maintain the building’s original design
criteria or change the design criteria to fit the current building load conditions. Bes-Tech
accomplishes these tasks through a well defined process composed of four (4) phases:



PHASE I – Preliminary Assessment


This is the first step in understanding your facility’s unique needs, operational challenges and
opportunities. A Phase I Assessment will include but is not limited to the following:


Estimate a range of potential annual energy savings values for each opportunity
(savings/year & cost to implement)
Additionally, a preliminary project plan (10% design level) will be written to identify the requirements for a Phase II Detailed Assessment and/or implementation requirements...


PHASE II – Detailed Assessment

The Phase II Assessment takes what we have learned in Phase I to the next level. A team of engineers come to your facility for 27 days to measure, study and evaluate every inch of your HVAC system including Air Handlers, Boilers, Chillers, Cooling Towers, VFDs, Economizers and much, much more. The report of findings and opportunities we provide back to you will impress even the most knowledgeable DPO, Chief Engineer, Facilities Manager or CLevel Director.

Some of the items covered in Phase II:


Once the field work is completed, all data is brought back to our facilities for engineering analysis and input into our computer modeling and algorithms. This creates a new baseline which is compared to the baseline established by your previous 12 months utility bills, onsite measurement results and the delta for savings is identified.

All of this data and the efficiency recommendations are prepared in a detailed report that identifies all the steps to be taken as part of the Phase III process. Retrofits, if any are identified and line item costs, savings and payback are provided.

The Phase II report will, at the very least provide you with several low or no costs energy saving steps that can be taken immediately and how much money/utilities consumption can be saved. Additionally, it may help provide 3rd party validation for modifications you have wanted to make for some time. Savings are demonstrated in both hard dollars (based on your current utility rates) and in verifiable kWh/Btu consumption reduction.


PHASE III – CC/TPOR Implementation

At this point in the process we have identified the opportunities for energy efficiency improvements and consumption reduction. Now there are two possible scenarios for implementation based on whether retrofits are involved.


Regardless of the type of implementation, we produce a summary report and take simple, straightforward documentation steps to ensure all support staff understands what we have done, why we have done it and how to support it going forward.

PHASE IV – Performance Verification, Training and After Care

Now that we have applied many of our twenty (20) patented technologies and over 200 dedicated processes, it is time to provide support.


Bottom Line: We provide consistent, reliable energy efficiency solutions that save you money, 24 hours a day, 365 days a year. Give us a call or drop us a note. One meeting could be the start of your company saving 20-60% in energy costs and consumption…